Molecular reactor
Generates heat and holds the mode via supply, return and air sensors.
+ATMTERM
ATP-TermaRON turns 1 kWh of electricity into 3 kWh of heat. No gas, boiler room or complex approvals.
✦Scales from a private home to an industrial complex
01 / Technology
In ATM-TERM, an electric impulse triggers hydrolysis, cavitation and resonant excitation of water molecules and heats the primary-loop coolant. Automation holds the mode using supply, return and air sensors, and the heat passes into the building system through a heat exchanger.
Generates heat and holds the mode via supply, return and air sensors.
+A heat exchanger transfers energy to the building system without mixing fluids.
+ZONT GSM / Wi-Fi lets you monitor the system from your phone.
+Module cross-section
A cross-section of the module. Tap a point to see each unit: the reactor shows the processes an electric impulse starts.
02 / Product line
Modules cascade into one thermal hub — from 10 kW to 10 MW.
Applications
From private homes to industrial plants — one principle, with modular capacity sized to the task.
Autonomous heating for houses, dachas and townhouses. No coal or firewood.
A solution for utilities and management companies. New builds with per-flat heating.
Commercial property with high reliability requirements.
Heating for hangars and production halls. Modules can be combined.
Car services, garages, fuel depots — anywhere open flame is not allowed.
Climate control for greenhouses, farms and poultry houses. No exhaust, which plants need.
Sports complexes, fitness clubs and out-of-town sports bases.
Temples, churches, mosques, synagogues and other heritage buildings.
Construction camps, mobile field points, seasonal campsites and glamping.
03 / How it works
ATP-TermaRON sits inside the building loop: the grid powers the reactor, then heat is distributed to the zones that need it.
Thermal point diagram · simplified animation of energy flows
04 / Completed projects
Real TermaRON sites: area, system composition and resulting running costs.
ResidentialKaliningrad
CommercialDarna
HospitalityVnukovo
Yakutsk
Simferopol
Moscow region
Komsomolsk-on-Amur
Tyumen
Moscow, Rublyovskoye hwy
Want the same? Send your site parameters and we will prepare a solution and calculation for your region.
Data from completed TermaRON projects. Costs for your site are calculated from the site questionnaire.05 / Field photos
Photos from sites: modules, controls and piping of the heat station.
06 / Turnkey packages
Presentation-based estimate. Final configuration depends on the heat balance, hot water and number of loops.
Transport, fuel storage and regional costs are confirmed from the project questionnaire.
07 / Comparison
Cost of 1 kWh of heat at business tariffs, October 2026, Moscow and Moscow region: electricity 10.8–16 RUB/kWh incl. VAT, diesel 86.7 RUB/l (Rosstat), diesel boiler efficiency 90%. An exact calculation is made from the site questionnaire.
Calculate your project08 / Benefits
TermaRON combines advanced technology with practical returns. Choose who you are — we will show what matters.
On large sites, savings run to hundreds of thousands a year — lowering the cost of your services and products.
No gas facilities to register and no boiler-room operators to hire. Quick installation with no gas-service approvals.
A module draws three times less than a standard electric boiler — no need to expand the supply or add a transformer.
No combustible fuel, so no supply disruptions. The system holds temperature on schedule automatically.
Fits heating projects of any scale and meets modern design standards.
Lower energy and operating costs make projects more attractive for clients.
A modular system for any load: a clear connection scheme and scaling without complex approvals.
Technical support at every stage, training, bonuses and joint projects for designers and chief engineers.
The compact module goes into a utility room, garage or boiler room. No chimney or separate furnace room needed.
No gas and no burning fuel — no carbon monoxide, fire or explosion risk. No hot surfaces.
Heats the house quickly and holds the temperature on its own. Works with underfloor heating and a hot-water tank.
Fits within the capacity already allocated to your plot — no extra connection charges.
Why it is reliable
09 / Trust
With ATP-TermaRON you get a patented technology and a team that supports your project from calculation to commissioning.
The developer of TermaRON technology has worked in energy saving since 1998.
Utility model patent. Finalist of the “Small Energy — Big Achievements” award (2018).
100+ sites from Adler to Yakutsk: homes, residential complexes, hotels and plants.
The equipment has been tested and complies with GOST and fire-safety standards.
Developers, management companies, industrial and municipal sites.
Engineers and the authors of the technology support the project at every stage.
Documents and awards
Copies of the documents are available on request together with a commercial proposal.
10 / FAQ
Did not find your answer? Leave a request — an engineer will reply and calculate your site.
Ask a question ↗No special permits are required. Modules up to 100 kW are not classed as hazardous facilities and need no gas-service approvals. Installation is standard electrical work under the electrical installation code. If your power demand grows, you only agree it with the utility, as for any electrical equipment. We provide all technical documentation.
TermaRON creates no high pressure, uses no gas and has no open flame. Heating happens without combustion, so the typical risks of gas and solid-fuel boilers are absent.
Minimal: usually one scheduled check a year before the season. No burner cleaning, fuel deliveries or complex servicing. A service engineer performs the check.
Yes. The system handles both heating and hot water and works with an indirect hot-water tank and underfloor heating. We choose the connection scheme for your site.
Warranty is 36 months on the module and 12 months on the ZONT controller. Design service life is 20+ years, proven on sites with harsh climates.
11 / Economics
Choose the area to see a power, consumption and payback estimate.
Illustrative estimate: replacing an electric boiler, the new bill is about 33% of the current one; diesel, about 50%; an LPG tank, about 90%. We calculate the exact heat balance and payback free of charge from your site questionnaire.
Transport, fuel storage and regional costs are confirmed from the project questionnaire.
ATMTERM / 2026
An ATMTERM engineer will calculate the heat balance and system configuration.